<blockquote id="ojex3"></blockquote>
    1. 伊人久久大香线蕉AV网禁呦,午夜大片免费男女爽爽影院,四虎在线播放亚洲成人,亚洲国产日韩一区三区,深夜福利资源在线观看,強壮公弄得我次次高潮A片,国产精品亚洲二区在线播放,国内极度色诱视频网站
      Hotline:400-880-1556

      English




      Notice! The new national standard GB/T 17743-2021 for lighting electrical products will be officially implemented from July 1, 2022

      Author:中認聯科 time:2022-05-27 Ctr:2058

      On December 31, 2021, the National Standards Management Committee of the State Administration for Market Regulation issued China National Standard Announcement No. 17 of 2021. This announcement contains the recommended national standard GB/T 17743-2021 "Limits and Measurement Methods of Radio Disturbance Characteristics of Electric Lighting and Similar Equipment", which will be officially implemented on July 1, 2022.

      GB/T 17743-2021 is equivalent to the IEC international standard CISPR 15:2018, which is an important test basis for electrical lighting and similar equipment in terms of emission disturbances.

      Scope of application

      This standard applies to radio frequency disturbances emitted (radiated and conducted) by the following equipment

      ◆ Lighting equipment (3.3.16)

      ◆ One of the main functions is the lighting part of the multifunctional device for lighting

       Note 1: Examples are lighting equipment for visible light communication, entertainment lighting

      ◆ UV and IR radiation equipment for residential and non-industrial applications

      ◆ Announcement logo

      Note 2: Examples include neon signboards

      ◆ Decorative lighting

      ◆ Emergency signs

      Major technical changes

      Compared with the old standard GB/T 17743-2017, except for structural adjustment and editorial changes, the main technical changes are as follows:

      1. The Scope chapter deletes the restrictions on the use of power supply and battery operation for appliances (see Chapter 1, Chapter 1 of the 2017 edition);

      2. In the frequency range from 300 MHz to 1 GHz, introduce radiation disturbance limits (see Chapter 4, 4.4.2 of the 2017 edition);

      3. Modified the expression of load terminal limit and CDNE (Alternative Method of Radiated Emission) limit (see Chapter 4, 4.3.2 of the 2017 edition);

      4. Delete the insertion loss requirement and its related content in Appendix A (see 4.2 of the 2017 edition, Chapter 5, Chapter 7, Appendix A)

      5. Introduce three basic ports: shell port, local wired port and wired network port (see 3.4.6, 3.4.10, 3.4.14, Chapter 4, Chapter 5, Appendix D)

      6. The test methods of Appendix B (CDNE) have been replaced by the relevant test methods of the CISPR 16 series of standards with appropriate reference to the CISPR 16 series of standards (see 9.3.4.4, see Appendix B of the 2017 edition);

      7. Revised the requirements for the metal hole of the tapered shell (see Figure A.2, Figure 7 of the 2017 edition);

      8. A new method for measuring conducted disturbance of GU10 self-ballasted lamps has been added (see Appendix A.1);

      9. Increase the current probe measurement method and the limits of various ports (except for the voltage limit and measurement method) (see Chapter 4);

      10. Introduce the term "module" (instead of stand-alone accessory) and the measurement requirements using the mainframe (reference) system module (see 6.4);

      11. Modified the specification of EUT stabilization time (see 7.8, 6.5.3 of the 2017 edition);

      For large EUTs (>1.6 m), add the use of a 60 cm loop antenna magnetic field measurement method at a distance of 3 m (method of CISPR 14-1) as an alternative to 3 m and 4 m loop antenna systems (LLAS) (see 4.5 .2).

      List of some key revisions

      1. Measurement circuit layout diagram of independent dimming device, transformer or converter (adding current probe method);

      電路布置圖.jpg

      2. Example of luminaire arrangement during radiation disturbance measurement (OATS, SAC or FAR);

      燈具布置舉例.png

      3. New: The test frequency range is extended to 1GHz, and the equipment used in the independent method of radiation disturbance measurement (30MHz~300MHz) is changed from CDN to CDNE (equipment update);

      4. Added: 60 cm loop antenna magnetic field measurement method;

      5. Increase the physical interface process judgment of EUT;

      6. Increase the determination process for EUT application limits.

      ZRLK has been focusing on the testing and certification of consumer electronic and electrical products in 18 years, always paying attention to the changes in regulations of various countries, and providing customers with one-stop testing and certification services to ensure that your products can quickly enter the target market. If you have electronic and electrical products and batteries or consumer smart products containing batteries that need to be tested and certified, please feel free to contact us, our engineers will serve you as soon as possible!

      Related Articles
      • Wireless router for export to Canada must have ISED IC certification: Comprehensive analysis

      • Smart door locks are entering Canada. Why is ISED IC certification so crucial?

      • Smartphone ISED Certification: A Compliance Guide for Entering the Canadian Market

      • 3D printers to be exported to South Korea? Please keep the KC certification and customs clearance guide handy

      Follow Us
      主站蜘蛛池模板: av一区二区中文字幕| 91孕妇精品一区二区三区| 亚洲开心婷婷中文字幕| 丰满少妇被猛烈进出69影院| 亚成区成线在人线免费99| 大地资源免费视频观看| 日韩一区二区三区日韩精品| 日韩精品一区二区三区中文无码| 自拍偷自拍亚洲一区二区| 秋霞人妻无码中文字幕| 成人性生交大片免费看r老牛网站 中文字幕一区二区三区四区五区 久久久久久毛片免费播放 | 国产精品视频一区不卡| 97人人超碰国产精品最新| 国产亚洲精品久久久久婷婷图片| 熟女在线视频一区二区三区| 六十路老熟妇乱子伦视频| 中文字幕av一区二区| 亚洲国产精品综合久久网络| 久久天天躁狠狠躁夜夜婷| 成人欧美日韩一区二区三区| 亚洲欧美日韩在线码| 亚洲一区二区乱码精品| 欧美性猛交xxxx富婆| 里番全彩爆乳女教师| 99热久久这里只有精品| 精品国产乱码久久久久夜深人妻| 亚洲精品日韩在线观看| 国产毛片基地| 国产成人综合欧美精品久久| 国产精品午夜福利资源| 永久免费无码av在线网站| 国产精品视频午夜福利| 久久精品亚洲中文字幕无码网站 | 3d全彩无码啪啪本子全彩| 国99久9在线 | 免费| 亚洲欧美日韩综合久久久| 精品国产欧美一区二区三区在线| 亚洲VA欧美VA国产综合| 亚洲AV成人片不卡无码| 亚洲成人av一区二区| 国产免费无遮挡吸奶头视频|